Run your numbers

Every productive shift starts with logistics

Fuel, equipment, access, and water either got planned or they didn't — and your crews find out at 6:00 AM. See what an unplanned site is costing yours.

01

Your project

Adjust the sliders to your project. Results update as you go.

05,000
$50$500

02

When was your logistics plan built?

Modeled on a 45-day event. Longer or shorter events scale roughly in proportion.


Your number

$1,081,500

is what your crews spend waiting instead of working.


Per worker

$1,082

Craft hours lost

11,594

Equivalent idle workers

26

Those craft hours are the equivalent of 26 people on the clock and not on tools, for the entire event.


You're past the span-of-control line.

In OnPoint's field experience, above roughly 250 craft on site a project loses span of control over logistics quickly — there are simply too many moving parts for supervision to absorb between other duties.


What's generating that number Someone on your site is doing all six of these today, between other duties.
  • Logistics coordination
  • Fueling services
  • Rental equipment management
  • Ground support
  • Hydration and sanitation
  • Traffic control
Where it goes
Rental equipment$0
Ground support$0
Hydration and sanitation$0
Fueling$0

Not counted in this number

Transportation: workforce movement and bussing are modeled separately in the OnPoint Transportation Efficiency Calculator.
Mobilization and demobilization: BRB and laydown layout, temp facility prep, equipment receiving, and end-of-event asset recovery and off-rent. Your coordinators absorb this today; it is scoped per project rather than modeled here.

What a single managed scope gives back

Range, not a point estimate

$270,375 – $540,750

Recoverable exposure (25–50%)

$157,500

OnPoint program cost

$112,875 – $383,250

Net back to the project

1.7:1 – 3.4:1

Return on program cost

Recovery is shown as a range because the achievable share varies by site and isn't knowable until a project is underway. The low end is the conservative planning case.