If you can't find it, you bought it twice. Use your project's numbers to see what material delays cost under a legacy approach, and what changes with a managed program through OnPoint.
01
Adjust the sliders to your project. Results update as you go.
02
From the OnPoint justification analysis.
Legacy material management cost
$0With OnPoint MMP (incl. fee)
$0Projected net savings
$0Material-related craft delay
Lost and re-ordered material
Restocking fees
1% of material spend. Reduced by 80% under the MMP.
Expediting and hot shots
MMP program fee
Inclusive of process, hardware, and TrackPoint software. Included in the MMP cost, so the savings shown are net of program costs.
Total
Materials personnel costs are comparable under either approach and are excluded from both sides.
Excluded as real but unquantified
Work resequencing, overtime and schedule compression, supervision time, preservation damage, and carrying costs. Results are a conservative floor.
Scope
Assumptions were validated on turnaround and capital project profiles, and the duration range (30 to 120 days) reflects that scope; longer-duration and nested materials management programs use a different fee and delay model and are outside this calculator. Reference point: on an actual Gulf Coast turnaround profile (40 days, 1,200 FTE per shift, about $83M in event labor spend), this model projects roughly $3.6M in net savings at the 50% reduction.