Comprehensive logistics planning and execution, materials management, and workforce transportation that keep your operations moving forward.
Five minutes here. Eight minutes there. Workers waiting for materials. Crews waiting for buses. Equipment sitting idle because no one coordinated delivery. Manpower-intensive jobs can lose up to 12,000 hours of productivity every single day.
Disorganized site logistics create more than inefficiency. They create safety hazards, schedule delays, contractor claims, and cost overruns. The pressure is constant. Schedules are aggressive. Budgets are tight. Workforces are large and coordination complexity multiplies with project scale.
You need comprehensive logistics management that eliminates wait time and keeps workers working.
OnPoint manages your entire logistics and materials ecosystem. From parking lot traffic flow to materials tracking, from bus routes to equipment staging, we ensure people, materials, and equipment are exactly where they need to be, when they need to be there.
For 35+ years, we’ve coordinated logistics on thousands of industrial projects. We’ve managed warehouses tracking tens of thousands of items. We’ve eliminated millions of hours of wait time through precise planning and flawless execution.
Find materials instantly, not in 20 minutes. On-site warehouses and laydown areas with TrackPoint tracking provide real-time location visibility. Kitting and just-in-time distribution mean materials arrive at work areas exactly when crews need them, not when it's convenient for the warehouse.
Every material movement tracked from receipt through distribution. Forward-looking capabilities identify materials needed for upcoming work. Mobile updates from anywhere on site. No more searching, no more delays.
Get workers to work on time, every time. Our 350+ DOT-compliant buses with professional CDL drivers replace chaotic individual transportation. Optimized routes and experienced coordinators ensure on-time arrivals while reducing your safety risk and parking needs by 80%+.
Workers stay productive with cold water available everywhere. Insulated totes holding 500 bottles maintain cold temperatures for 2-4 days. Scheduled delivery means totes arrive before they're empty, not after workers run out.
Track, fuel, and maintain rental equipment efficiently. Timely off-rent coordination minimizes costs while ensuring availability when you need it.
$2.1 million in productivity savings
Reduced from 130 vehicles to 23 buses
Reduced operational and safety risk exposure
OnPoint has successfully deployed logistics teams including:
250+
team with water totes, WatchPoint, workforce transportation, materials management
Baton Rouge, LA
250+
safety and logistics professionals
Lemont, IL
250+
team with execution coordinators and materials management
Billings, MT
200+
team with ventilation and materials management
Corpus Christi, TX
125+
team with WatchPoint, ventilation, workforce transportation
Pascagoula, MS
100+
team with execution coordinators and workforce transportation
Martinez, CA